We bought a swing set today and have 3-4 weeks to get ready for the install. My plan is to mark the area and the dig down about 4". After the install the set I will fill it with mulch. I don't plan to use a border, the top of the mulch will be level with the yard (ideally). The guy at home depot suggested renting a mid tine tiller and then just shoveling the dirt out after I run the tiller through the area. What other suggestions for clearing out the area at least 4" deep.
Thanks!
Thanks!