I am having trouble doing boulder math. Anyone out there good at this? And can maybe show me how you figure out how many ton I will need?
I am filling a ditch.
170 by 10 and 6" deep.
trying to figure about how many ton I will need of 3 to 6" field stone
I am filling a ditch.
170 by 10 and 6" deep.
trying to figure about how many ton I will need of 3 to 6" field stone