turfquip
LawnSite Senior Member
- Location
- Florence, Kentucky
Hi Guys,
I do exterior maintance on a strip center which has several pot holes both singularly and in groups. Once the areas have been marked and saw cut, I'll have approx 1000 s.f. to rework. I'll be renting all the necessary equipment to do the job, and will be using dense grade, and hot mix to repair the holes.
What is the going rate for repairs of this nature? And, how thick should the blacktop be applied over the gravel? My guess is two to three inches.
I'm obviously new to blacktop repair so any help would be appreciated.
I do exterior maintance on a strip center which has several pot holes both singularly and in groups. Once the areas have been marked and saw cut, I'll have approx 1000 s.f. to rework. I'll be renting all the necessary equipment to do the job, and will be using dense grade, and hot mix to repair the holes.
What is the going rate for repairs of this nature? And, how thick should the blacktop be applied over the gravel? My guess is two to three inches.
I'm obviously new to blacktop repair so any help would be appreciated.