I'm new to multiple mow crews and I'm still working out the kinks.
I run 2 crews of 2 men.
I have been giving each crew a daily mow list based on my grow hour rate. I then put a little side note to help with timing(maybe after the 4th property of the day it should be around 10am). I do this to help them not rush through properties and keep a check on details.
Do you run into problems if one crew works harder or does more Than the other? I have 1 crew with only 1 ztr operator. The other crew has 2 ztr operators.
How do you go about getting a list of properties scheduled? Any advice or tips?
Posted via Mobile Device
I run 2 crews of 2 men.
I have been giving each crew a daily mow list based on my grow hour rate. I then put a little side note to help with timing(maybe after the 4th property of the day it should be around 10am). I do this to help them not rush through properties and keep a check on details.
Do you run into problems if one crew works harder or does more Than the other? I have 1 crew with only 1 ztr operator. The other crew has 2 ztr operators.
How do you go about getting a list of properties scheduled? Any advice or tips?
Posted via Mobile Device