1. Can’t make it to the GIE+EXPO 2017?
    LawnSite brings the trade show floor to your fingertips with our new GIE+EXPO 2017 Sneak Peek video series debuting now in the Lawn Mowing forum.

    Dismiss Notice

How much do you bring home from this job?

Discussion in 'Turf Renovation' started by benabarlow, Apr 28, 2005.

  1. benabarlow

    benabarlow LawnSite Member
    Messages: 51

    lets say there are two people at a job. They rake, edge, and mulch. Its 8 yrds of hemlock mulch which is $360 customer price. It takes the both of them 8 hrs to do the job. What would you bid? I know there are a bunch of variables, but any suggestion as to what people are biding would be great thanks.
    Ben
     
  2. slicksilverado01

    slicksilverado01 LawnSite Member
    from Ohio
    Messages: 173

    what is your price on the mulch?? for me in my area people charge between 45-100 per yard of mulch. and that is with naturally hardwood mulch that is between $21-27 a yard around here. I charge 55-85 a yard depending on how bad the beds are. since there is two of you I would charge $100 per cubic yard with clean up so that would be $800. again this price would be seen in ohio not sure on what your area charges.
     
  3. Jpocket

    Jpocket LawnSite Silver Member
    Messages: 2,281

    I would bid $1,000 even. Though im always alittle high on my jobs i wouldn't go below $850
     
  4. DennisF

    DennisF LawnSite Bronze Member
    from Florida
    Messages: 1,381

    Mulch is $360

    Labor is 2 X 8 X whatever your hourly labor rate is.

    Ex:
    Hourly labor rate = $25

    2 X $25 X 8 = $400


    Total price to customer $760.
     
  5. grassmanvt

    grassmanvt LawnSite Senior Member
    Messages: 906

    8 hours total or each, then as said before, your desired hourly times hours plus mulch. Don't forget the time picking it up either.
     
  6. sildoc

    sildoc LawnSite Silver Member
    Messages: 2,925

    That must be one overgrown area to take 2 guys 8 hours to do. my guess is 2-2.5 hours to mulch for 2 guys and the rest is to rake and edge. I am guessing long narrow beds so with this in mind it will be a min of 800 and upwards of 1100. I am thinking that 2 guys can edge and rake and lay mulch in less than 4 hours.
     

Share This Page