Wow!
I'm an expert now..
thanks for the compliment, but I still got a lot to learn. Paul and stone got me by a mile here......but appreciated.
As for the fabric, heres what I figure.
If I get the install job at the shore, I think I am going to 'wrap' the fabric around a layer of base course.
what i mean is that, for the drive area for example, I'll probably go for about 9 inches of base, so what I will do is lay fabric, then lay 3 inches, compact, then lay 3 more, compact, and then 'wrap' the fabric onto the top of that course, and then finish off with the last 3 inches/compact. that way the fabric gets pinched around 6 inches of base. I think I'll wrap around 2 ft or so of the fabric around the side.
the reason I am doing it this way is from experiences at the airport. All of our runways/taxways are built on wetlands, so they are always sinking. When they do a repair, they cut out a section and use this technique for the base courses under the asphault. Now, its a little more in depth than what I suggested, but the engineers call for that 'wrapping' of the fabric also.
I'm gonna take another look now at exactly how they have it set, I think they even use another piece on top of the base course also.
steveair