Stoner figure 1 guy can lay 1 pallet in 1 hour,figure thats without having to cut anything in,2 pallets (1000 square feet roughly)equals 2 hours. By the way,where in Ma.(the great state)
I usually have two guys hauling it right to the site from the trailer(wherever)And I'am cutting it sometimes there might be two of us cutting and two hauling. This last fall four of us layed 4 1/2 pallets in about 2 hours, but we had to take a few panels of fence down and hand it through because through was no back gate. Fixing to pick up 6 pallets of fescue Sat. and lay this weekend.Almost always takes longer to prepare ground.
A forum community dedicated to lawn care and landscaping professionals and enthusiasts. Come join the discussion about performance, modifications, classifieds, troubleshooting, maintenance, and more!