Lawn Care Forum banner
1 - 8 of 8 Posts

·
Registered
Joined
·
118 Posts
I usually have two guys hauling it right to the site from the trailer(wherever)And I'am cutting it sometimes there might be two of us cutting and two hauling. This last fall four of us layed 4 1/2 pallets in about 2 hours, but we had to take a few panels of fence down and hand it through because through was no back gate. Fixing to pick up 6 pallets of fescue Sat. and lay this weekend.Almost always takes longer to prepare ground.

----------
T.J. Greenfield
 
1 - 8 of 8 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top