The lawns I'm picking up all seem to be 1 acre props that havn't been mowed for a month right now I use a 42" LT to mow them.
Last night did a prop that took 1 hour to weed whack and 2 hours to mow give or take.
My theory is to get to about 75% capacity I'm only at 20% right now and get a ZTR.
My question is do I go ahead and get the ZTR first thing next spring or go ahead and wait until I get to the 75% capacity.
And the lawn I did last night had about 20 trees and some flower beds to mow around and had to double cut about 1/2 of it. Assuming the 42" LT took me 2 hours how much time could I shave off the mowing time with a ZTR say a 48"