    i like the dual.
    had a few hiccups but nothing too crazy.
    definitely get the handheld programmer. it makes things a ton easier
     
  3. Sprinkus

    Sprinkus LawnSite Silver Member
    Messages: 2,246

    For those familiar with 2-wire systems:
    Found an old Huhnterr IDS 2-wire module while poking through some old stuff the other day. Interestingly enough it had "Made In Denmark" on it.
     
  4. SoCalLandscapeMgmt

    SoCalLandscapeMgmt LawnSite Silver Member
    Messages: 2,044

    There is a company in Denmark who makes all of the decoders for Rain Bird, Tucor and I guess Hunter as well.
     
  5. 1idejim

    1idejim LawnSite Fanatic
    Messages: 10,599

    What is inside of a decoder?
    Posted via Mobile Device
     
  6. Wet_Boots

    Wet_Boots LawnSite Fanatic
    Messages: 49,565

    all kinds of neat stuff
     
  7. HokieAg07

    HokieAg07 LawnSite Senior Member
    Messages: 357


    IDS = Things nightmares are made of
     
  8. greenmonster304

    greenmonster304 LawnSite Gold Member
    Messages: 3,464

    a few more. we finished installing the main and wire today. started the well up and did a flow test, 45 gpm @ 50 psi at the furthest point from the pump. site is still out of power from the storm so had to use my generator to run the pump and controller.

    photo 1(4).jpg

    photo 2(6).jpg
     
  9. Mike Leary

    Mike Leary LawnSite Fanatic
    Messages: 22,817

    Not bad at all. The loose wire from the clock would have cleaned it up if it was in conduit. Why were sch 80 unions not used on both sides of the p.o.c.? Nice boot shot,M
     
  10. greenmonster304

    greenmonster304 LawnSite Gold Member
    Messages: 3,464

    I had to use carflex conduit because the gas line runs horizontal along the building and i couldn't fit rigid conduit behind it so i had to go over it. the 2" stainless union was supplied by the well driller and i didn't see any reason to change it out.
     